Context switching (and friends)

Splitting time on a project into small chunks, especially with day (or days) gaps between, adds a fairly hefty context-switching tax. Related: a 100% full schedule has bad effects on us, our work, and our colleagues.

Context switching

Some of the things that can take a hit:

  • we compromise the quality of our work
    • we lose some of our attention to detail
    • we leave things unfinished
  • we’re less productive: the same amount of work takes longer overall
  • we create technical debt (and design debt and …)
  • we’re more mentally tired from the extra effort of switching and re-switching

In particular, coming back to an accessiblity audit after a context-switch takes a long time. We deliver our best work on audits when we can keep a lot of it in our head at once.

More WIP means:

  • more work that could wrong
  • more things taking up head space, apart from just the one thing we’re working on right now
  • feeling productive because we’re touching lots of tasks (but that’s not the same as being more productive)
  • less time and space to think
  • more context switching!

A little wiggle room

When there’s some slack in the schedule, when we’re not booked to 100%:

  • we have capacity to deal with unexpected things and interruptions
  • we give our brains time to rest, process, recharge
  • we have room to correct any errors error
  • we have time to improve through reflection and adaptation
  • we can be creative because we have time to be
  • we are able to help our colleagues
  • we can learn new skills

What to do

  • Limit context-switching, so that can keep delivering high quality work and don’t get burnt out
  • Limit WIP, so that we finish things and are more productive
  • Leave some space in the schedule, so that we don’t feel rushed and can handle interruptions and unexpected events more gracefully